Scheduling Software & Mobility | Anexia Digital Engineering
Smarter scheduling.
Vehicles, staff, routes and shifts: we build scheduling systems that plan scarce resources efficiently and reliably.
- Configurable scheduling engine
- For rail, public transport and logistics
- Duty and shift scheduling included

One core, many domains.
Rail connections, bus lines or supply chains: the underlying logic of scheduling is closely related. We build on a configurable core with constraint-based optimisation and graph algorithms such as Dijkstra or A*, adapting per domain through rules rather than new code. An event-driven architecture recalculates plans in fractions of a second.
Configurable core
One scheduling core, specialised to each mode of transport and process.
Real time & optimisation
Planning under real constraints, with an eye on utilisation and cost.
Integrated
Connected to existing, timetable and ERP systems through stable interfaces.
Cross-domain
One core for rail, public transport, logistics and shift planning.
Scheduling for every domain.

Scheduling core
A configurable basis for resource and deployment planning.

Rail transport
Precise, reliable scheduling for rail operations.

Public transport
Planning for bus and local transport under real constraints.

Logistics & supply chains
Route and resource planning for efficient operations.

Transport
Intelligent scheduling for the transport sector.

Duty & shift planning
Staff and shift planning that respects availability and rules.
Synchronised. Optimise your planning.
We map your resource, route and shift planning in a robust system and connect it to your ERP via API. Talk to our engineers about your planning.

