Scheduling Software & Mobility | Anexia Digital Engineering

Optimization

Smarter scheduling.

Vehicles, staff, routes and shifts: we build scheduling systems that plan scarce resources efficiently and reliably.

  • Configurable scheduling engine
  • For rail, public transport and logistics
  • Duty and shift scheduling included

One core, many domains.

Rail connections, bus lines or supply chains: the underlying logic of scheduling is closely related. We build on a configurable core with constraint-based optimisation and graph algorithms such as Dijkstra or A*, adapting per domain through rules rather than new code. An event-driven architecture recalculates plans in fractions of a second.

  • Configurable core

    One scheduling core, specialised to each mode of transport and process.

  • Real time & optimisation

    Planning under real constraints, with an eye on utilisation and cost.

  • Integrated

    Connected to existing, timetable and ERP systems through stable interfaces.

  • Cross-domain

    One core for rail, public transport, logistics and shift planning.

Synchronised. Optimise your planning.

We map your resource, route and shift planning in a robust system and connect it to your ERP via API. Talk to our engineers about your planning.