Scope
App for field service or warehouse on iOS and Android, sign-in with the company account, forms and barcode scanning, offline capture and sync with the ERP system.

What does an app cost? A sound answer starts with what drives the effort. Anexia Digital Engineering has been estimating app projects across the DACH region since 2008. Here we explain which factors shape the price and which levers you control yourself.
Search for the price of an app and you will find answers that are orders of magnitude apart, and both ends can be right. That does little for a budget decision. Anyone researching app development costs needs to understand where the price comes from and where it can be influenced, not a ballpark figure.
Effort is the unknown
Every estimate follows the same logic. The effort in person-days accounts for most of it, plus third-party costs for licences, services and infrastructure.
Know the drivers
Seven factors shape the effort more than any others. Knowing them early lets you steer deliberately instead of being caught out mid-project.
Beyond go-live
New iOS and Android versions, changing store rules and ageing libraries create work every year, even when no new feature is added.
Choose the contract
Fixed price, time and materials and agile fixed price spread risk and flexibility differently. The choice shapes how your budget behaves over time.
An app is not an off-the-shelf product. Two applications that look identical to an outsider can differ in effort by a factor of five. One displays data from a clean interface. The other has to connect three legacy systems, work without a network and pass a regulator's review. That is why reputable providers quote ranges rather than fixed prices before a concept exists. If you receive an exact figure after a short phone call, it either hides a generous risk premium or the task has been underestimated. Either way, it comes back to you sooner or later.
In the end, every estimate is a multiplication. The estimated effort in person-days is priced at the agreed rate per person-day, plus third-party costs for licences, services and infrastructure. That rate depends on region, qualifications and company size. Freelancers often charge less, large consultancies considerably more. The real unknown is the effort. Halve the scope and the cost of app development roughly halves too. Add a second native platform and it rises, though not to double.
Many clients think of app development costs purely in terms of programming. It is the largest item, but far from the only one. Workshops, user flows, technical architecture and alignment with business units and IT make up only a small share of the budget. Yet this block decides whether the rest of the money is well spent.
Design effort varies widely with ambition. The path runs through rough flows and a clickable prototype to a finished design system. An app in the platform's own style with standard components is designed quickly, while a distinctive brand experience with animations and illustrations costs many times more. In the build itself, covering interface, logic, local data and access to device features, the choice of technology has the greatest impact.
The backend is often underestimated. Is there already an API that delivers exactly what the app needs? Or does data from ERP, CRM and shop systems have to be brought together first? Backend and integration work is frequently on the same scale as the app itself. Quality assurance covers automated tests, manual testing on devices, security checks and accessibility. Cut corners here and you pay after launch with poor reviews.
Project management and coordination cover planning, scheduling, documentation and communication. The more people involved on your side, the larger this share becomes. Publishing comes last, with store listings, copy, screenshots, privacy details, age ratings and review. It is not a large item, but it needs time in the calendar and belongs in the project plan from the start.
This page describes cost drivers, not prices. Match your project to one of the three example scenarios. We prepare a project-specific budget range after the first conversation, once the missing information is available.
1 of 3
1 of 3
1 of 3

A reliable estimate takes shape in three stages. After the first conversation, you receive a rough range. A compact concept phase produces a backlog in which every feature is estimated individually. During the build, we report on budget used and remaining in every sprint.
The type of contract also affects how app development costs behave over the life of a project. A fixed price gives budget certainty but requires a complete specification. The provider prices in its risk and every change becomes a change request, which makes the model suitable for small, sharply defined projects. With time and materials, you pay for what is delivered. It is flexible and, when well managed, the most economical model, but it relies on trust and ongoing oversight.
For larger projects, we prefer an agile fixed price. After a separately commissioned concept phase, a budget framework is agreed for a defined scope. Within that framework, items can be swapped as long as the overall scope stays the same. You keep control of costs without giving up the flexibility every product needs once real users start giving feedback.
An app creates work every year, even when no feature is added. Apple charges an annual fee for the developer account, Google a one-off fee. On top come hosting, database and monitoring for the backend, licences for services such as maps, push, analytics or crash reporting, adaptation to new iOS and Android versions and changed store rules, library updates and security fixes, plus bug fixing and support. A common industry rule of thumb puts maintenance and minor changes at 15 to 20 per cent of the original development cost per year. Apps with many dependencies or frequent change can exceed that.
If you sell digital content or subscriptions in the app, Apple and Google keep a share. Up to 30 per cent is common, with 15 per cent for smaller providers and many subscriptions. Exact rates vary by store and region and change regularly. Physical goods and services delivered outside the app are exempt. This belongs in the business plan, not just the invoice.
High quality and reasonable app development costs are not mutually exclusive. Start with the core and remove everything from the first version that does not directly serve the business goal. A lean app that does three things very well beats an overloaded one that does twenty things moderately. Choose the right technology, because not every app needs to be native. For many business applications, Flutter or React Native is the more economical choice, and if a web application already exists, a hybrid app can reduce the effort further.
For sign-in, payments, maps or chat, mature services exist that cost a fraction of building your own, although their running fees have to be weighed against the effort saved. If your IT team provides and documents the required APIs before the project starts, a frequent cause of delay disappears. A product owner with decision-making authority who answers questions within a day saves more over the project than any negotiation on price. And a prototype tested by five real users exposes mistakes before they are coded.
There are, however, places where cutting the cost of app development leads to follow-up costs many times higher. Programming without clear requirements means building twice. Bugs found by customers cost reviews and trust as well as the fix. A data breach is more expensive in every respect than a penetration test, and an app left unmaintained for two years can often only be brought up to date with considerable effort. Very low quotes usually come from missing items, so ask whether backend, testing, project management, publishing and warranty are included.

An app that arrives via a link, works offline and sends notifications. When a progressive web app is enough and when it is not.

How to recognise a reliable partner for your app, which questions belong in your selection and what you can expect from Anexia.

Write and test business logic once in Kotlin while the interface stays native on iOS and Android. A step-by-step route to less duplicated work.

How we keep apps secure, current and in the stores during live operation, with known deadlines, clear ownership and documented knowledge.

Ionic and Capacitor turn your web application into an app for iOS and Android, built on the knowledge your team already has.

Apps for Samsung smart TVs and professional displays that run reliably on older and newer model years and pass Samsung's review.
App development for iOS, Android, the web and large displays, guided by measurable goals and supported well beyond the store launch.
An app that arrives via a link, works offline and sends notifications. When a progressive web app is enough and when it is not.
How to recognise a reliable partner for your app, which questions belong in your selection and what you can expect from Anexia.
Write and test business logic once in Kotlin while the interface stays native on iOS and Android. A step-by-step route to less duplicated work.
React Native and Flutter for cross-platform plus native development with Swift and Kotlin - mobile applications for iOS and Android.
Interaction concepts, prototyping in Figma, design systems, usability testing and accessibility to WCAG 2.1 for complex B2B software.
Tell us about your idea, your system landscape and your goals. In a no-obligation first conversation, you receive an initial range and learn which decisions influence the price most. That turns the general question of app development costs into a concrete basis for your budget planning.