Airport ground operations | Anexia Digital Engineering

Punctuality is won on the ground.

Every flight depends on a chain of ground processes. We plan vehicles, gates and turnarounds as one optimisation problem, so fewer resources carry more flights.

Less equipment, same service.

Ground handling is expensive when it runs unplanned. We model it precisely and raise efficiency without touching service quality.

  • 15 to 25 per cent smaller fleet

    At the same service quality, through better allocation and fewer empty runs.

  • Response in milliseconds

    Real-time optimisation re-dispatches instantly on delays and disruptions.

  • Connected to AODB and A-CDM

    Stable interfaces to the systems your airport already runs on.

  • Operated in Europe

    Compute-intensive optimisation on our own cloud in Germany and Austria.

Together. Let's replan your ground operations.

From the GSE pool to the turnaround: we show where optimisation saves fleet and protects punctuality. Talk to our engineers.