Anexia wants to generate its own electricity for data centers worldwide. The first small hydropower plant on the Liesing is to be followed by others.
Anexia equips the state-of-the-art laboratory ANX.labs for over 1000 students at the HTL Mössingerstraße in Klagenfurt.